Owner: TriMet
Joint Venture Project: Stacy and Witbeck, Inc., Granite Construction Co., Wildish Standard Paving Co.
Location: Portland, Oregon
Status: Under Construction
Construction Period: January 2007 to April 2009
Contract Amount:$165 Million Design Build / CMGC
Alignment Description: Double track alignment that runs parallel to the I205 freeway between TriMet’s Gateway Transit Center and the Clackamas Town Center.
Unique Features:
  · South Corridor Constructors: a CMGC project joint
    venture between Stacy and Witbeck (50%), Granite
    Construction (25%), and F.E. Ward (25%)
  · 6.5 Miles of Ballasted Double Track
  · Eight at Grade Stations
  · Seven Bridge Structures
  · Four Park and Rides
  · One Cut and Cover Box Structure
  · 250,000 sf of retaining walls