Owner: Utah Transit Authority
Location: Salt Lake City, Utah
Status: Under Construction
Construction Period: Completion Early 2008
Contract Amount: $32 Million CM/GC
Unique Features:
· New light rail tracks extend the existing
system from Gateway Shopping Center/Delta
Center area to the Intermodal Hub pedestrian
plaza. The Intermodal Hub is the connection point
for the Front Runner Commuter Rail (also a Stacy
and Witbeck/Herzog project) and Amtrak.
· Full reconstruction of street from building
to building including new utilities; 1,700 lf of
a 30-inch water line; 6,500 tf of paved track;
3500 tf ballasted track ; 3 Each Station platforms.
· Project also required rehabilitation of a 100
year old 48-inch diameter brick arch sewer using
a non-destructive technology called Cured-In-Place
Pipe (CIPP). CIPP is installed in the existing
sewer without any digging. The liner is made of
polyester felt and thermosetting (heat activated)
polyester resin. The final product resembles
a PVC pipe.
|
|