Owner: Valley Metro
Location: Phoenix, Arizona
Status: Under Construction
Construction Period: _______ to 2008
Contract Amount: Approx $61 million
Line Runs: From 26th Street to the North Approach to the Tempe Town Lake Bridge
Unique Features:
· Joint Venture project with Sundt
· First piece of paved track constructed in the state
· Over 4 miles of new water mains including 36" and
54" steel pipe mains
· 3 miles of new storm and sewer
· Over a mile of under track casing pipe
· 199,896 SF of new sidewalks and 15 miles of new
curb (1/2 curb and gutter)
· 123,420 SY of new asphalt and 73,173 SY of grind
and rubberized asphalt overlay
· 75,000 to 90,000 CY of unclassified excavation
· 15,000 CY of rock excavations including over 7,400
CY of trench rock
· Nearly 10 miles of paved track
· A mile of direct fixation track on the Tempe Town
Lake Bridge
· 2 - 100 meter turnouts and 4 - 100 meter crossovers
|
|