Owner: Valley Metro
Location: Phoenix, Arizona
Status: Under Construction
Construction Period: _______ to 2008
Contract Amount: Approx $61 million
Line Runs: From 26th Street to the North Approach to the Tempe Town Lake Bridge
Unique Features:
  · Joint Venture project with Sundt
  · First piece of paved track constructed in the state
  · Over 4 miles of new water mains including 36" and
    54" steel pipe mains
  · 3 miles of new storm and sewer
  · Over a mile of under track casing pipe
  · 199,896 SF of new sidewalks and 15 miles of new
    curb (1/2 curb and gutter)
  · 123,420 SY of new asphalt and 73,173 SY of grind
    and rubberized asphalt overlay
  · 75,000 to 90,000 CY of unclassified excavation
  · 15,000 CY of rock excavations including over 7,400
    CY of trench rock
  · Nearly 10 miles of paved track
  · A mile of direct fixation track on the Tempe Town
    Lake Bridge
  · 2 - 100 meter turnouts and 4 - 100 meter crossovers