Stacy Witbeck https://www.stacywitbeck.com/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This CM/GC project will provide increased bus service along a 5.3-mile route connecting the Ogden Intermodal Transit Center, downtown Ogden, Weber State University, and McKay-Dee Hospital. Riders will be able to access the FrontRunner commuter rail system at the Ogden Intermodal Transit Center, which Stacy Witbeck also built. 

Scope includes utility work, earthwork, roadway reconstruction, retaining walls, architectural concrete, new stations, pedestrian improvements, and traffic signals. Work within the Weber State University campus includes a new bus-only road running through the center of campus and a BRT station located next to the student union. Major work on campus was performed during the summer months to avoid impacting the university.

Quick Facts

Location

Ogden, UT

Project Type

Light Rail, Parks & Public Spaces

Delivery Method

CM/GC

Date Completed

2023

Project Owner

Utah Transit Authority

Region

Mountain

OWSUB
OWSUB
OWSUB

"This is one of the best projects I have worked on, thanks, in part, to the dedication and commitment that Stacy Witbeck has shown."

Utilities Coordinator, Utah Transit Authority