Streetcar Commuter Rail Maintenance Facility
 

© 2009 Stacy and Witbeck, Inc.

Denver Regional Transit District (RTD)

Project :: West Corridor Fastracks Light Rail Expansion

Stacy and Witbeck, Inc. and Herzog Contracting Corp.
Owner: Denver Regional Transit District (RTD)
Project Location: Denver, Colorado
Status: Under Construction
Pre-Construction: June 2006 through May 2009
Construction Period: May 2009 through June 2012
Contract Amount: $330,000,000
Project: Joint Venture: Stacy and Witbeck, Inc. and Herzog Contracting Corp.

Unique Features

  • Nine (9) miles of ballasted double track and three (3) miles of single track
  • Thirteen (13) LRT bridge structures
  • Three (3) pedestrian bridge structures
  • Two (2) “Top Down” tunnel structures (one (1) under I-70)
  • 600,000 sf of MSE and retaining walls
  • Twelve (12) stations with parking at many
  • Two (2) parking structures (one (1) is new $10M Design-Build CCO)
  • Twenty-One (21) at-grade crossings
  • 700,000 cy of excavation / 255,000 cy of embankment

Project Photos

  • Denver-1
  • Denver-2
  • Denver-3
 

Please contact us to discuss your project.

Stacy & Witbeck, Inc.

1320 Harbor Bay Parkway Suite 240
Alameda, CA 94502-6580

Phone: 510-748-1870
Fax: 510-748-1205
Email: HQ / N. California
403 SE Caruthers
Portland, OR 97214-4557

Phone: 503-231-5300
Fax: 503-231-6692
Email: NW Regional Office
5030 S. Mill Avenue, Suite 5
Tempe, AZ 85282

Phone: 480-839-4844
Fax: 480-838-9582
Email: SW Regional Office

Stacy and Witbeck, Inc. is proud to announce that we are the proud recipients of the APWA 2009 Public Works Project of the Year Award for our Muni Metro East Light Rail Vehicle Maintenance and Operations Facility in San Francisco, CA.