Denver Regional Transit District (RTD)
Project :: West Corridor Fastracks Light Rail Expansion
| Owner: | Denver Regional Transit District (RTD) |
| Project Location: | Denver, Colorado |
| Status: | Under Construction |
| Pre-Construction: | June 2006 through May 2009 |
| Construction Period: | May 2009 through June 2012 |
| Contract Amount: | $330,000,000 |
| Project: | Joint Venture: Stacy and Witbeck, Inc. and Herzog Contracting Corp. |
Unique Features
- Nine (9) miles of ballasted double track and three (3) miles of single track
- Thirteen (13) LRT bridge structures
- Three (3) pedestrian bridge structures
- Two (2) “Top Down” tunnel structures (one (1) under I-70)
- 600,000 sf of MSE and retaining walls
- Twelve (12) stations with parking at many
- Two (2) parking structures (one (1) is new $10M Design-Build CCO)
- Twenty-One (21) at-grade crossings
- 700,000 cy of excavation / 255,000 cy of embankment