Valley Metro Rail (VMR)
Project :: Northwest Light Rail Extension
| Owner: | Valley Metro Rail |
| Project Location: | Phoenix, Arizona |
| Status: | Under Construction |
| Construction Period: | June 2009 thru December 2012 |
| Contract Amount: | $165,000,000 |
| Project: | Joint Venture: Stacy and Witbeck, Inc. and SUNDT |
Unique Features
- 3.2 miles of paved double track
- Over 46,000 feet of new water line including 2,000 feet of 36” main
- Over 17,000 feet of new sewer line
- 13,000 feet of new storm drain line including 48” main and 60” x 28” elliptical pipe
- 8,000 feet of new casing pipe under tracks
- 175,000 sy of asphalt removal with over 150,000 sy of new asphalt being placed
- 110,000 sf of new sidewalks and 29,000 lf of new curb and gutter
- 71,000 cy of roadway and guideway excavation
- Four (4) – 100 meter single crossovers and one (1) – 100 double crossover
- Three (3) station platforms with one (1) - 600 space Park-n-Ride lot