Stacy Witbeck https://www.stacywitbeck.com/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

Our country is clamoring for high-speed rail, and our partnership with Brightline is primed to deliver it. Currently in preconstruction, this project will use AREMA Class 9 Tier III track and systems allowing for speeds up to 200 MPH. The route will travel from Las Vegas, NV, to Rancho Cucamonga, CA, providing residents of Los Angeles and Las Vegas a more convienient means of traveling between the two.

During the precronstruction phase, the team has value engineered millions of dollars in savings in order to help secure additional funding. The all-electric trains will be able to travel the entire journey in just over two hours, halving the typical drive time and providing a more environmntally friendly form of transit. Throughout this process, the team has integrated European Norms (EN) with federal and local standards to ensure the system is built to the best practices of high-speed rail while remaining compliant to U.S. regulartions.

Quick Facts

Location

Las Vegas, NV, to Los Angeles, CA

Project Type

High-Speed Rail

Delivery Method

Design-Build

Date Completed

Ongoing

Project Owner

Brightline

Region

West

First Spike
Train Render
Station Render